Catalogue

Search Results

Catalogue Search

Additional search filters and navigation

Results 1 - 10 of 13 (page 1 of 2)
Benefit-cost analysis : Lake Manitoba regulation / [prepared by E. Kuiper].
History of engineering development in the Summerberry Fur Development Project / W.W. Ramsay, hydraulic engineer, James Clark, asst. hydraulic engineer, M.E. Moffat, engineering-aide III.
Report on Canadian Pacific Railways Emerson subdivision / prepared by A. Kohuska, P.Eng., Geotechnical Section.
The effects of the operation of the Portage Diversion on the south basin of Lake Manitoba / Crowe, Jo-Anne M.E.
Impacts of artificial control of water levels on natural resources in the Lake Manitoba Basin : report to the Lake Manitoba Basin Initiative / by W. Cowan.
Benefit-cost analysis : Assiniboine River flood control and water conservation projects / prepared by E. Kuiper.
Lake Winnipeg Regulation in October, 1974 = Churchill River Diversion in October, 1975.
Big Grass River flood control summary report / prepared by H. Schellenberg, agr. economist and R. Harrison, planning engineer.
Benefit-cost study proposed Red River Diversion to Marsh River / prepared by Planning Division.
E.I.C. tour of water control projects : Sanford Dam ; Norquay Floodway ; Stephenfiled Dam ; Morden Dam.

Search Results Facets

Search Results List

Additional Resources