Catalogue

Record Details

Catalogue Search


Back To Results
Showing Item 10 of 13

Government of Manitoba's response to the Economic review of BiPole III and Keeyask Generating Station (ERBK). Cover Image Book Book

Government of Manitoba's response to the Economic review of BiPole III and Keeyask Generating Station (ERBK).

Record details

  • Physical Description: 62 pages ; 28 cm.
    print
  • Publisher: Winnipeg : Government of Manitoba, 2022.

Content descriptions

General Note:
November 30, 2022.
Tabled paper 36, 42nd Legislature, 5th session.
Subject: Economic Review of BiPole III and Keeyask Commission (Man.)
Keeyask Generating Station (Man.)
BiPole III (Electric power transmission line) (Man.)
Hydroelectric power plants -- Economic aspects -- Manitoba
Electric power transmission -- Economic aspects -- Manitoba
Overhead electric lines -- Economic aspects -- Manitoba

Available copies

  • 2 of 2 copies available at Legislative Library.

Holds

  • 0 current holds with 2 total copies.
Show All Copies
Location Call Number / Copy Notes Barcode Shelving Location Holdable? Status Due Date
Legislative Library, Vaughan Street Manitoba SpR 2020 ERBK c.1 (Text) 36970100366394 Manitoba Volume hold Available -
Legislative Library, Vaughan Street Manitoba SpR 2020 ERBK c.2 (Text) 36970100366147 Government Reference Not holdable Onsite consultation -

Electronic resources


Back To Results
Showing Item 10 of 13

Additional Resources