Catalogue

Record Details

Catalogue Search


Back To Results
Showing Item 2 of 55

Churchill River Diversion augmented flow program. Cover Image Serial/magazine Serial/magazine

Churchill River Diversion augmented flow program.

Manitoba (issuing body.).

Record details

  • Physical Description: print
    volumes.
  • Publisher: Winnipeg : Manitoba, 1986?-2021.

Content descriptions

General Note:
This is an annual amendment to the Churchill River Diversion interim licence.
"In order to test the effectiveness of the CRD project in 1978, we requested approval to test the diversion capacity over a wider range of flows than was set out in the Water Power Act Licence. After a multi-year testing phase, we received approval in 1986 to change the water flows in winter and summer. This approach became known as the Augmented Flow Program and it continues to the present day under an annual continuance of our Interim Licence. Under this program, maximum flows through the Notigi Control Structure are about 15% greater, and Southern Indian Lake experiences a greater range of water levels."- Manitoba Hydro website.
Subject: Manitoba Hydro.
Water resources development -- Manitoba
Hydroelectric power plants -- Manitoba
Water diversion -- Churchill River (Sask. and Man.)

Available copies

  • 2 of 2 copies available at Legislative Library.

Holds

  • 0 current holds with 2 total copies.
Show Only Available Copies
Location Call Number / Copy Notes Barcode Shelving Location Holdable? Status Due Date
Legislative Library, Vaughan Street Manitoba Hydro Annual 2007/08 (Text) 36970100318320 Manitoba Not holdable Onsite consultation -
Legislative Library, Vaughan Street Manitoba Hydro Annual 2020/21 (Text) 36970100318338 Manitoba Not holdable Onsite consultation -

Back To Results
Showing Item 2 of 55

Additional Resources