Catalogue

Record Details

Catalogue Search


Back To Results
Showing Item 11 of 29

Nelson River hydro-electric development : phase 1 : interim report  Cover Image Book Book

Nelson River hydro-electric development : phase 1 : interim report

Nelson River Programming Board (Author). Stephens, D. M. (Added Author). Storey, T. E. (Added Author). Kristjanson, Kris. (Added Author). Manitoba Hydro (Added Author).

Record details

  • Physical Description: print
    8 leaves ; 28 cm.
  • Publisher: Winnipeg : Nelson River Programming Board, 1965.

Content descriptions

General Note:
"December 1965".
27th Legislature, 5th session (1966), sessional paper number 52.
Pursuant to Agreement between the Government of Canada and Government of the Province of Manitoba Manitoba (Manitoba Hydro), dated May 27, 1964.
Members of the Committee for Manitoba: D.M. Stephens, T.E. Storey, Kris Kristjanson ; members for Canada, John A. MacDonald, T.M. Patterson, H.B. Rosenberg.
Subject: Hydroelectric power plants -- Manitoba -- Nelson River
Water resources development -- Manitoba -- Nelson River
Electric power production -- Manitoba
Water diversion -- Churchill River (Sask. and Man.)
Nelson River (Man.) -- Power utilization

Available copies

  • 1 of 1 copy available at Legislative Library.

Holds

  • 0 current holds with 1 total copy.
Show Only Available Copies
Location Call Number / Copy Notes Barcode Shelving Location Holdable? Status Due Date
Legislative Library, Vaughan Street Manitoba SpR 1963 Nelson River c.1 (Text) 36970000300873 Manitoba Not holdable Onsite consultation -

Back To Results
Showing Item 11 of 29

Additional Resources